Regulation level DAMAS Traiding e-Portal Auction Office e_TRACE
Regulation level DAMAS Traiding e-Portal Auction Office e_TRACE
On-Line Data  
Data about Transmission System  
Transmission System Development  
Operation of the Transmission System  
Consumption Charts  
Preparation for 2006  
Transmission Network  
Unavailability of Blocks > 100 MW  
Services  


Planned and unplanned failure of generation units > 100 MW

According to Commission Decision of 9 November 2006 amending the Annex to Regulation (EC) No 1228/2003 on conditions for access to the network for cross-border exchanges in electricity CEPS to inform about ex-post planned and unplanned failure of generation units > 100 MW.



The files containing ex-post informations about planned and unplanned failure of generation units > 100 MW are available here.


The file containing Abbreviations is available here.

 
 
Last updated: 6/1/2009

 
© 2000 - 2003  |  CEPS, a.s.  |  iMagic, s.r.o.
Online-data Czech