Generating unit outages

The total value of power output lost due to unplanned outages of generating units with installed capacity higher than 100 MW.

In conformity with Regulation (EU) No. 543/2013, which is effective from January 5, 2015, ČEPS publishes the required information on the central European platform EMFIP (http://transparency.entsoe.eu/) operated by ENTSO-E.

Downloads: