Market transparency

 

This page contains information which is subject to market transparency requirements as set out by EU energy legislation, specifically the general principles defined in EC Regulation No. 1228/2003 (or No. 714/2009) on conditions for access to the network for cross-border exchanges in electricity. In addition, other information based on various relevant reports and recommendations from national Regulators can also be found on this page.

Structured data is gathered from both internal and external data systems. Where external data cannot be gathered in a structured electronic form, a hyperlink to the data source is provided. Text information or information which is not often changed is provided in the form of separate documents or texts.

Since market transparency requirements are subject to regular changes, related especially to new EU binding legislation currently under preparation, this page will be updated accordingly so as to reflect the latest requirements.

The Transmission System Operator in the Czech Republic hereby informs market participants as required by Regulation (EC) No 714/2009 on conditions for access to the network for cross-border exchanges in electricity.

5.1. Network access
Network use
Report on where andwhy the congestion exists
Methods applied for managing the congestion

 

Plans for CM in the future

5.2. Description of the CM method applied under different circumstances for maximising the capacity available to the market

 

General scheme for the calculation of the interconnection capacity

5.3.

Capacity allocation procedures

5.4.

The operation and planning security

5.5.(a)

Long-term evolution of the transmission infrastructure and its impact on cross-border transmission capacity

5.5.(b) Yearly capacity forecast

 

Monthly capacity forecast

5.5.(c)

Weekly capacity forecast

5.5.(d)

Day-ahead available capacity

Since 2011: http://www.central-ao.com/index.php?option=com_content&view=article&id=213&Itemid=219
Until 2011: http://market.e-trace.biz/statistics.asp
1.6.2010 – 31.12.2010 for APG: https://dae.ceps.cz/
1.1.2008 – 31.4.2010 for APG: https://market.ceps.cz/atc_overview.asp

 

Intraday capacity and statistics

Since 2011: https://dae.ceps.cz/
Until 2011: https://market.ceps.cz/intraday_statistics.asp

5.5.(e)

Total capacity already allocated

Since 2011: http://www.central-ao.com/index.php?option=com_content&view=article&id=213&Itemid=219
Until 2011: http://market.e-trace.biz/statistics.asp

5.5.(f) Auction results (yearly, monthly, daily)
5.5.(g)

Total capacity used

5.5.(h) Physical flows
 

Curtailment

5.5.(i) ex/ante information on planned outages >100MW
 

ex/post information on planned and unplanned outages >100MW

5.7. Demand
  Generation